30 MLD Bulk Water Supply Project for Daraga Water District 2012

In the picturesque town of Daraga, where water sustains life and livelihoods, Trigen Water orchestrated a transformative endeavor—the 30 MLD Bulk Water Supply Project. Completed in 2012, this initiative exemplifies efficiency, sustainability, and community impact.

Capacity Amplification: Trigen Water engineered a robust water infrastructure, elevating Daraga’s water supply capacity to an impressive 30 million liters per day (MLD). This expansion was meticulously designed to meet current demands and accommodate future growth.

Source Optimization: Drawing water from local resources, including rivers and aquifers, the project ensured a sustainable supply. By preserving the delicate balance between extraction and replenishment, Trigen Water safeguarded Daraga’s water security.

Seamless Delivery: The project seamlessly integrated treatment facilities, transmission pipelines, and distribution networks. Trigen Water’s holistic approach minimized losses, optimized distribution, and ensured uninterrupted water flow to homes, industries, and businesses.

In summary, the 30 MLD Bulk Water Supply Project stands as a beacon of Trigen Water’s unwavering commitment—a lifeline that nourishes Daraga’s present and future.