80 MLD Water Treatment Plant for Da Nang, Vietnam

Trigen Water embarked on a transformative journey with the Puerto Princesa Water District Brgy. Irawan Project—a testament to our unwavering commitment to efficient water supply solutions. Let’s delve into the intricacies of this pivotal endeavor:

Strategic Design:

  • Trigen Water meticulously planned the WTP, considering factors such as water source availability, treatment capacity, and community needs.
  • Our engineers collaborated closely with local authorities and stakeholders, ensuring alignment with Puerto Princesa’s vision for sustainable water management.

Cutting-Edge Installation:

  • The WTP’s installation involved state-of-the-art equipment, including coagulation, sedimentation, and filtration units. These processes effectively removed impurities, delivering high-quality potable water.
  • Rigorous quality control measures were applied during construction, guaranteeing compliance with industry standards.

Community Impact:

  • The completion of the 25,000 CMD WTP directly impacted the residents of Brgy. Irawan. Clean, reliable water flowed seamlessly, enhancing health, sanitation, and overall quality of life.
  • Industries and businesses within the area thrived, knowing that their water supply was responsibly managed.

Environmental Stewardship:

  • Trigen Water’s design considered ecological impact. The WTP’s location and operation minimized environmental disruption, preserving local ecosystems.
  • Ongoing monitoring ensures sustained performance, reinforcing our commitment to responsible water solutions.

In summary, the Puerto Princesa Water District Brgy. Irawan Project stands as a beacon of excellence—a testament to Trigen Water’s vision, expertise, and dedication to enhancing lives through efficient, safe, and sustainable water supply.